Home/Cases/Distributor

Distributor · Illustrative example

Field assault pack program for a distributor network

A repeatable 45 L assault pack built to one approved construction so the distributor could re-order across regions without re-sampling.

MOLLE layoutHarnessBatch consistency
Field assault pack program for a distributor network

Background & constraint

The distributor sold into several regions with different pouch standards, and had previously received packs whose webbing spacing varied between batches.

Re-orders were slow because each region supplied slightly different references, forcing a new sample round every season.

Solution & structure

We fixed a single webbing row count and spacing, and documented it as a measured control point rather than a visual reference.

Colour, hardware and marking were separated into variant options on one approved construction, so regional differences no longer required a new pattern.

A retained approved sample and material record were kept for the style, referenced on every re-order.

Sampling rounds

First sample reviewed for attachment spacing, harness anchor reinforcement and base panel construction.

Second round closed marking method and packaging, including carton marks for three destination regions.

Customisation decisions recorded for this project
ItemDecision
Shell1000D nylon, water-repellent finish
AttachmentFive webbing rows, fixed spacing
HarnessPadded harness with sternum strap
MarkingWoven label plus regional hangtag
PackingPolybag, barcode, carton mark

Delivery & QC

Bulk ran against the approved sample with IQC and OQC records retained per batch.

Cartons carried batch references so the distributor could trace a specific shipment back to its inspection record.

Outcome

The program concluded with a documented construction, a retained approved sample and a batch reference for each shipment, so repeat orders could be placed without re-developing the style.

Start a similar project

Next step

Start from the constraint, not the catalogue.

Send the requirement that is hardest to satisfy. If we cannot meet it, we will say so in the feasibility note.